1INSTALLATION AND OPERATING INSTRUCTIONSMETALFAB BIN ACTIVATORSDescription1. Upper hanger (suspension arm) brackets are pre-assembled, at the factory
2Installation _ Assembly1. Specific sequence of installing a Metalfab Bin Activator can be changed tosuit individual requirements. Most important is
38. When installing units not completely assembled, the correct procedure is tocompletely assemble the unit at grade with the following procedure:A.
42. Because the Bin Activator and the motor vibrate, the electrical connectionsmust be made with flexible lead. Braided neoprene covered cable isrec
5Note: Bin Activator vibrator should be electrically interlockedwith down stream feed devices, i.e., when screw, belt,rotary, etc. feeder stops _ vibr
6WARNING: Because of the elastomeric seals required on vibratedequipment, the Bin Activator WILL NOT CONTAIN A FIRE OREXPLOSION. If a fire is in the
Commenti su questo manuale